What needs a gas line
- Outdoor barbecues and fire tables with a quick-connect outlet.
- Gas ranges and cooktops replacing electric ones.
- Tankless water heaters, which draw more gas than tanks.
- Garage and shop unit heaters.
- Gas dryers and fireplaces.
Each new appliance adds load. We calculate the total so the meter and main line can supply everything at once.
Licensing and permits
In Ontario, gas piping must be installed by a TSSA-registered gas contractor, by a technician holding the right gas certificate. Gas work is inspected, and some jobs require a permit or notification. Never let anyone run gas line who cannot show you their TSSA registration. We also make sure the gas utility is aware when a larger meter is needed.
Black iron, CSST flexible tubing and copper each have rules for where they can be used. We follow them.
Pressure testing
- Run the line, with a shut-off valve at every appliance.
- Cap and pressure test for the required time with a gauge.
- Check every joint with leak detection solution.
- Purge air, connect the appliance and light it.
- Leave the tag and paperwork with you.
Signs you need this in your house
- New range or dryer
- BBQ hookup
- Outdoor heater
- Moving appliance
Every new gas line holds a gauge test overnight-style before any appliance gets hooked on.
Questions people ask us
How long to add a BBQ line?
Most are done in half a day.
Can you move my gas range?
Yes, as long as the line can be routed safely.
